Another Complex Pipeline, Successfully Inspected!
- Feb 16
- 1 min read
Updated: Apr 8
We are please to share another successfully completed in-line inspection project. This time a 10” pipeline over 1.5 km in length in South America, featuring mixed materials (carbon steel and stainless steel) and tight 1.5D bends, a combination that often challenges conventional inspection tools.

Using our Phased Array UT ILI inspection technology, the campaign delivered combined crack detection, wall loss, and geometry data in a single run, maintaining consistent data quality across material transitions and complex pipeline features.
Get in touch to learn more about the project:



