Why Preparation Is Critical To Every Pipeline Inspection
- Jan 29
- 1 min read
Updated: Feb 2
99% of the work happens before the tool ever enters the launcher.

What you see on site is the final few hours. What you don’t see is the months and years of preparation behind it.
Before launch, we’ve already completed:
• Tool design, development, and manufacture (decades of experience)
• Tool assembled for specific pipeline configuration
• Ultrasonic setup tailored to the inspection objectives
• Calibration and pressure testing
• Test-loop pump through verification of odometer accuracy and data quality
• Mobilisation of equipment and personnel
By the time the tool is in the launcher, the inspection has already been engineered.
The run is execution. Preparation is where success is built.