Why preparations are key for every PAUT-PIG™ inspection?
- 2 days ago
- 1 min read
Before our inspection tools enter our customers pipelines, every stage of launch preparation is carefully managed. Here, PAUT-PIG™ was being loaded into the launcher ahead of inspection operations of a long distance diesel pipeline. Preparation included:
✔ Tool calibration and pressure testing
✔ Phased Array inspection set up
✔ Odometer testing
✔ Vibration testing
✔ Battery run down testing

Careful preparation helps support reliable inspection performance throughout long distance pipeline operations.
Speak with our team to learn more:



